January 27, 2007 Work Day Projects

Tuesday 23 January 2007.
 

Saturday is a scheduled work day. We sill start about 9 AM. Some of us will be there a little earlier. Come when you can get there. The usual lunch will be provided.

Check out the list below and bring appropriate tools to tackle the project of your choice.

We should be finished shortly after noon so come prepared to spend the rest of the day sailing of hanging out. The forecast right now, for what it is worth, is for a high of 59 degrees around 3 PM and winds of 6 to 7 mph.

January 27, 2007 Work Day Projects (subject to change)

1. Repair Seawall near Swings

2. Electric Outlet under Porch

3. Inspect B, C, and D Docks, Determine what needs to be done and make a materials list. If materials are on hand for minor repairs then fix.

4. Move water heater to basement

5. Repair flat tire on Grill

6. Clean refrigerator

7. Tile in men’s rest room

8. Organize basement, identify items which appear to be abandoned, combine like kind supplies.

9. Repair tile floor around the front door.

10. Add cut off valves at the base of the outside water faucets.

11. Clean Gutters

12. Clean Rest Rooms

13. Mop and clean Kitchen

14. Mop and clean Main Hall

15. Wash Windows

16. Prune bushes

17 Raise walkway approaching A Dock (trip hazard).

Bring needed tools including but not limited to the following:

1. Shovel and rakes, hoes, axes, saws.

2. Plumbing Tools

3. Gas Blower

4. String Trimmer

5. Carpentry Tools