{{July 19 Work Day }} We have a work day scheduled for this coming Saturday. We will start about 9 and finish by noon. Arlene Mueller will prepare the traditional lunch of dogs and beans or whatever she decides. Projects for the Day – Cut Grass and Weed Eat. -Gutter on front of Clubhouse needs additional braces installed. – Cut off and remove remaining two old dock poles. We removed the big one last week. – Caulk Gutter near the mail entrance. – Blow off roof, deck and under deck. – Blow off pavilion – Blow off the barge – Clean Bath Rooms – Clean main room -Clean Kitchen – Continue construction of outdoor shower. – Add slides on aluminum dock where ramp is abrading. – Add cable between Alum dock and poles. Repositioning Parked Boats and Trailers – We need to look at the parking situation and possibly reposition some boats so that can more boats can be parked. Remember that the club rules require that empty trailers not be parked next to the chain link fence and that these spaces be reserved for boats on trailers. Several members have two and some three trailers/boats on the grounds. Although there are no club rules about having more than one boat on the grounds, please consider storing any extra boats which you are not using off the grounds. Hope to see you Saturday. Jimmy