Report on January 27 Club Work Day

We had 16 members at the work day. In addition several members worked a few days before and after on some of the projects. Ken Griffin and Ronnie Young moved the hot water heater to the basement and George Thorpe repaired the tile floor near the urinal in the men’s bath room. Special thanks go to Arlene for preparing the lunch for the other workers. One of the projects was to cap off a water spigot that was recently discovered outside the fence near the lift. In the process of doing this, a water line was cut and that had to be repaired. At the same time a cut off valve was installed that turns off water to the outside spigots at the lift, picnic area and pavilion. This valve will be left in the off position during most of the winter months. If anyone needs the water turned on to these areas, the valve is located in the ground near the fence in the lift area and is covered by what looks like a partially buried wooden box. Several people have expressed an interest in tackling some club projects during times other than scheduled work days. I will be posting a list of projects later and anyone interested in doing some of them can contact me or Howard Gregory if any special supplies or materials are needed.